Waiting for the snow to melt…
Knowledge graph centered on DEM gap-filling and harmonization with 5 nodes and 8 connections. Top connected: Upper East River Beaver Pond, Ian K Breckheimer, Bare-earth Digital Elevation Model for the Upper E, Gap-filled Bare-earth Digital Elevation Model for .
Gap-filling areas outside Upper East River domain with interpolated data from 3m ASO DEM, harmonized with NEON DEM and filtered to remove small pits and peaks.
Synthesized from method descriptions across 0 papers using this protocol.