Counting marmots…
Knowledge graph centered on Field drilling and core logging with 4 nodes and 5 connections. Top connected: metal concentrations, oil shale development, Shale drilling field notes, lithologic descriptio.
Hand written field notes, visual inspection of drill core during recovery, and digital photography of recovered core materials.
Synthesized from method descriptions across 0 papers using this protocol.